Five batch jobs A through E arrive at a computer center in the order A to E at almost the same time. They have estimated running times of 6, 4, 1, 3, and 7 minutes. Their ( externally determined ) priorities are 3, 5, 2, 1, and 4, respectively, with 5 being the highest priority. For each of the following scheduling algorithms, determine the mean process waiting time. Ignore process switching overhead.
a) Round Robin ( assume quantum = 1 )
b) Priority scheduling
c) First-come first-served
d) Shortest job first
For a), assume that the system is multitasking, and that each job gets its fair share of the CPU. For b) through d) assume that only one job at a time runs, until it finishes. All jobs are completely CPU bound.

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 19:10, Destinationz
Asteam is contained in a rigid tank with a volume of 1 m3. initially, the pressure and temperature are 7 bar and 500 oc, respectively. the temperature drops due to cooling process. determine: (1) the temperature at which condensation begins in °c, (2) the fraction of the total mass that has condensed when the pressure decreased to 0.5 bar. (3) the volume in m3 occupied by saturated liquid at the final state?
Answers: 3
image
Engineering, 04.07.2019 19:20, praveen35301
Amass-spring-viscous damper system of mass 3 kg has a frequency of 100 rad/s and is critically damped. its initial conditions are x(0)-3 mm and (0)-2.3 m/s. does the system overshoot its equilibrium position? prove your answer
Answers: 1
image
Engineering, 05.07.2019 23:20, neisha2507
Which one of the following faults cause the coffee in a brewer to keep boiling after the brewing cycle is finished? a. an open circuit in the heating element b. a short circuit at the terminals c. welded contacts on the thermostat d. a leak around the gasket
Answers: 3
image
Engineering, 06.07.2019 02:30, piperk19
Define thermoplastic polymers and thermosetting polymers in terms of their structures, and (ii) describe briefly a process suitable for the production of products from each type of polymer.
Answers: 3
Do you know the correct answer?
Five batch jobs A through E arrive at a computer center in the order A to E at almost the same time....

Questions in other subjects:

Konu
History, 20.03.2021 18:00
Konu
Mathematics, 20.03.2021 18:00
Konu
Mathematics, 20.03.2021 18:00