Engineering
Engineering, 15.04.2020 20:17, darrriannn7241

An equity portfolio is worth $100 million with the benchmark of the Dow Jones Industrial Average. The Dow is currently at 20,000, and the corresponding portfolio beta is 0.96. The futures multiplier for the Dow is 10. What is the correct number of contracts and position needed to double the portfolio beta?

Long 300 contracts.
Long 480 contracts.
Short 480 contracts.
Short 320 contracts.

answer
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, bunnles
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
image
Engineering, 04.07.2019 18:10, skpdancer1605
Ariver flows from north to south at 8 km/h. a boat is to cross this river from west to east at a speed of 20 km/h (speed of the boat with respect to the earth/ground). at what angle (in degrees) must the boat be pointed upstream such that it will proceed directly across the river (hint: find the speed of the boat with respect to water/river)? a 288 b. 21.8 c. 326 d. 30.2
Answers: 3
image
Engineering, 04.07.2019 18:10, Talos02
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
image
Engineering, 04.07.2019 18:10, genyjoannerubiera
Assuming compressible flow of air and that the measurements are done at flagstaff a pitot static tube that gives the difference of total and static pressure measures 0.35 m of mercury. what is the velocity of air? assume the temperature to be 300k. (submit your excel or matlab calculation sheet)
Answers: 1
Do you know the correct answer?
An equity portfolio is worth $100 million with the benchmark of the Dow Jones Industrial Average. Th...

Questions in other subjects:

Konu
Mathematics, 20.10.2020 23:01
Konu
Physics, 20.10.2020 23:01