Two production methods are being compared. One manual and the other automated. The manual method produces 10 pc per hour and requires one worker at $ 15.00 per hour. Fixed cost of the manual method is $ 5,000 per year. The automated method produces 25 pc per hour, has a fixed cost of $ 55,000 per year, and a variable cost of $ 4.50 per hour. Determine the Break – Even Point (BEP) for the two methods; that is, determine the annual production quantity at which the two methods have the same annual cost. Ignore the cost of material used in the two methods

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 03:10, lauriepdx17
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
image
Engineering, 04.07.2019 18:10, skpdancer1605
Ariver flows from north to south at 8 km/h. a boat is to cross this river from west to east at a speed of 20 km/h (speed of the boat with respect to the earth/ground). at what angle (in degrees) must the boat be pointed upstream such that it will proceed directly across the river (hint: find the speed of the boat with respect to water/river)? a 288 b. 21.8 c. 326 d. 30.2
Answers: 3
image
Engineering, 04.07.2019 18:10, ayoismeisjjjjuan
Manometers are good examples of measuring instruments, nowadays they are not as common as before. a)-capacitive probe gauges b)-gravitational gauges deformation ) gauges d)-digital gauges
Answers: 1
image
Engineering, 04.07.2019 19:10, babas97
What is a monomer? how do they form a ploymer from the view point of chemical bonding?
Answers: 1
Do you know the correct answer?
Two production methods are being compared. One manual and the other automated. The manual method pro...

Questions in other subjects:

Konu
Mathematics, 08.12.2021 02:50
Konu
Mathematics, 08.12.2021 02:50