Engineering
Engineering, 06.04.2020 23:37, Dkhaurithompson

Which type of flowchart scheduling technique has a fixed duration of production activities? In which type of flowchart are they probabilistic
The IPM v type of flow chart has a fixed duration for production activities. The
production activities.
type has a probabilistic duration for

answer
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 15:10, margaret1758
If you were designing a bumper for a car, would you prefer it to exhibit elastic or plastic deformation? why? consider the functions of a bumper in both a minor "fender-bender" and a major collision.
Answers: 1
image
Engineering, 04.07.2019 12:10, Ryantimes2
On a average work day more than work place firs are reorted
Answers: 1
image
Engineering, 04.07.2019 18:10, johnthienann58
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
image
Engineering, 04.07.2019 18:20, xcapo1x
Refrigerant-134a enters the compressor of a refrigerator as superheated vapor at 0.14 mpa and -10°c at a rate of 0.05 ka/s and leaves at 0.8 mpa and 50°c. the refrigerant is cooied in the condenser to 0.72 mpa and 26'c. it is then throttled to 0.15 mpa. sketch the t-s diagram for the system and evaluate: 6) the rate of heat removai from the refrigerated space (kw), it) the power input to the compressor (kw), ii) the isentropic efficiency of the compressor (%), and iv) the cop of the refrigerator.
Answers: 2
Do you know the correct answer?
Which type of flowchart scheduling technique has a fixed duration of production activities? In which...

Questions in other subjects:

Konu
Mathematics, 14.12.2021 01:00
Konu
Mathematics, 14.12.2021 01:00