Q1) An engineer is considering the 4 machines below for laboratory railway track testing. Using present worth analysis, which machine should be selected? MARR is 8% per year.
Estimates Machine A Machine B Machine C Machine D
Initial cost, $ -144,000 -130,000 -155,000 -94,000
AOC, $/year -10,000 -11,100 -15,000 -1,000
Salvage value, $ 2,500 0 5,000 4,400
Life, years 3 6 3 6
Answers: 3
Engineering, 04.07.2019 03:10, lauriepdx17
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
Engineering, 04.07.2019 18:10, viicborella
Steel is coated with a thin layer of ceramic to protect against corrosion. what do you expect to happen to the coating when the temperature of the steel is increased significantly? explain.
Answers: 1
Engineering, 04.07.2019 18:10, samanthabutryn
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
Engineering, 04.07.2019 18:10, tobyhollingsworth178
Which from the following instrument is commonly used to detect the high pitch butzing sound in bearings? [clo4] a)-digital ultrasonic meter b)-infrared camera c)-spectroscopic d)-vibrometer