Design two circular primary clarifiers with effluent weirs installed in the periphery of the tank to treat a wastewater flow of 12900 m3/d. Calculate the weir loading rate and hydraulic detention time. Assume the clarifiers having a 2 m side water depth (Assuming the desired overflow rate = 20 m3/m2×day).

answer
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, katelynn73
Atmospheric air has a temperature (dry bulb) of 80° f and a wet bulb temperature of 60° f when the barometric pressure is 14.696 psia. determine the specific humidity, grains/lb dry air. a. 11.4 c. 55.8 d. 22.5 b. 44.1
Answers: 1
image
Engineering, 04.07.2019 18:10, krystabrewer3
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
image
Engineering, 04.07.2019 18:20, yasyyas646646
Agas mixture consists of 8 kmol of h2 and 2 kmol of n2. determine the mass of each gas and the apparent gas constant of the mixture.
Answers: 3
image
Engineering, 04.07.2019 19:10, Destinationz
Asteam is contained in a rigid tank with a volume of 1 m3. initially, the pressure and temperature are 7 bar and 500 oc, respectively. the temperature drops due to cooling process. determine: (1) the temperature at which condensation begins in °c, (2) the fraction of the total mass that has condensed when the pressure decreased to 0.5 bar. (3) the volume in m3 occupied by saturated liquid at the final state?
Answers: 3
Do you know the correct answer?
Design two circular primary clarifiers with effluent weirs installed in the periphery of the tank to...

Questions in other subjects:

Konu
Mathematics, 31.08.2020 19:01
Konu
Mathematics, 31.08.2020 19:01