Engineering
Engineering, 04.04.2020 06:05, falgunim4

Consider a processor and a program that would have an IPC of 1 with a perfect 1-cycle L1 cache (All accesses are hit). Assume that each additional cycle for cache/memory access causes program execution time to increase by one cycle and 50% of instructions are loads/stores and the L1-Instruction cache hit rate is 100%. Assume the following MPKMIs(Miss Per Kilo Memory Instruction) and latencies for the following caches: • L1:32 KB: 1-cycle: 80 MPKMI • L2: 256 KB: 10-cycle: 50 MPKMI • L3:2 MB: 30-cycle: 20 MPKMI • 14:32 MB: 100-cycle: 5 MPKMI. • Memory: 250-cycles Estimate the CPI for the following cache configurations:

1. L1-L2-L3-L4
2. L1-L2-L3
3. L2-L3-L4
4. L1-L2-L4

answer
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, danksans7011
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
image
Engineering, 04.07.2019 18:10, michellerosas
Ajournal bearing has a journal diameter of 3.250 in with a unilateral tolerance of 20.003 in. the bushing bore has a diameter of 3.256 in and a unilateral tolerance of 0.004 in. the bushing is 2.8 in long and supports a 700-lbf load. the journal speed is 900 rev/min. find the minimum oil film thickness and the maximum film pressure for both sae 20 and sae 20w-30 lubricants, for the tightest assembly if the operating film temperature is 160°f. a computer code is appropriate for solving this problem.
Answers: 3
image
Engineering, 04.07.2019 18:10, wirchakethan23
Hydraulic fluid with a sg. of 0.78 is flowing through a 1.5 in. i. d. pipe at 58 gal/min. the fluid has an absolute viscosity of 11.8 x 105 lbf-sec/ft2. is the flow laminar, turbulent or within the critical range? give both a numerical reynolds number and a term answer.
Answers: 3
image
Engineering, 04.07.2019 18:10, samanthabutryn
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan