Calculate the RWL and the LI for the following task. As forgings exit a cooling bath, they are loaded into various tumblers for finishing. Each forging weighs 15 pounds and is lifted from a conveyor that is 36 inches high to a tumbler that is 48 inches high. The forgings are relatively small, so the hands are only 5 inches from the waist. The process completes a forging every 10 seconds. The coupling is considered fair, and the operator works a full 8-hour shift.

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, mm016281
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit. explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
image
Engineering, 04.07.2019 18:10, aliopqwas
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
image
Engineering, 04.07.2019 18:20, kodyclancy
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
image
Engineering, 04.07.2019 19:20, horsedoggal1234
Consider airflow over a flat plate of length l = 1.5 m under conditions for which transition occurs at le = 0.9 m based on the critical reynolds number, re, e = 5 x 10. evaluating the thermophysical properties of air at 400 k, determine the air velocity. (hint: use the tables to find the properties of air)
Answers: 3
Do you know the correct answer?
Calculate the RWL and the LI for the following task. As forgings exit a cooling bath, they are loade...

Questions in other subjects:

Konu
Computers and Technology, 22.07.2021 23:00