Engineering, 12.03.2020 23:49, tryintopassenioryear
For the next few questions, examine the following code: 1 ADD X1, X2, X3 2 SUB X2, X1, X5 3 LDUR X8, [X5, 0] 4 ADD X7, X8, X6 Assuming hardware hazard detection and no forwarding hardware, what is the CPI of this code (you may assume that this is in the middle of a long string of instructions so initial pipeline fill time is 0).
Answers: 1
Engineering, 04.07.2019 18:10, johnthienann58
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
Engineering, 04.07.2019 18:10, krystabrewer3
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
Engineering, 04.07.2019 18:20, alexis9263
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
For the next few questions, examine the following code: 1 ADD X1, X2, X3 2 SUB X2, X1, X5 3 LDUR X8,...
Mathematics, 31.08.2019 22:10
History, 31.08.2019 22:10
Computers and Technology, 31.08.2019 22:10
History, 31.08.2019 22:10
History, 31.08.2019 22:10
History, 31.08.2019 22:10
History, 31.08.2019 22:10
History, 31.08.2019 22:10