Engineering
Engineering, 12.03.2020 11:42, angelicahouston8727

2. A 10 g bullet has a horizontal velocity of 400 m's when it strikes and loges in a 2.5 kg
wooden block. The block is initially at rest, the mass of the bumper B can be neglected.
and he floor is smooth. In the motion after the impact, the maximum compression in the
spring is observed to be 73 mm.
Detentnine :
1. The percent of the bullet's initial kinelic energy which was lost as a result of the
collision
The velocity of die block and the bullet when the block instially impa is the
1200 NS
400 ms

answer
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:20, alexis9263
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
image
Engineering, 04.07.2019 19:10, kayleeemerson77
Analyze the factors that influence the choice between the following pairs of processes to make the products indicated: i) sand casting versus die casting of an electric-motor housing ii) thread rolling versus machining of a bolt for high-strength application. (co3/c5)
Answers: 3
image
Engineering, 04.07.2019 19:20, kaitlyn114433
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
image
Engineering, 06.07.2019 04:30, vedros
State two advantages and two disadvantages of interchangeability.
Answers: 3
Do you know the correct answer?
2. A 10 g bullet has a horizontal velocity of 400 m's when it strikes and loges in a 2.5 kg
wo...

Questions in other subjects:

Konu
Mathematics, 22.01.2020 07:31
Konu
Mathematics, 22.01.2020 07:31