Engineering, 11.03.2020 05:37, browndariel
Consider two possible schemes for measuring angular velocity with an encoder. In Scheme A, a timer is set for a specified time interval TA, and the number of W/B transitions, MA, occurring in that interval are counted. In Scheme B, the time, TB, required for a fixed number MB of W/B transitions is measured.
Which of the following statements is true?
a. In scheme A, time interval TA is not the exact time that has elapsed for MA W/B transitions.
b. In scheme A, time interval TA is the exact time that has elapsed for MA W/B transitions.
c. Scheme A and scheme B, both have the same level of accuracy.
d. Scheme A is better than scheme B.
e. Scheme A is equivalent to scheme B.
Answers: 2
Engineering, 04.07.2019 16:10, TheOriginalMeyah
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
Engineering, 04.07.2019 18:10, ahmedeldyame
Aloaded platform of total mass 500 kg is supported by a dashpot and by a set of springs of effective stiffness 72 kn/m. it is observed that when the platform is depressed through a distance x = 12.5 cm below its equilibrium position and then released without any initial velocity; it reaches its equilibrium position in the shortest possible time without overshoot. find the position and velocity of the loaded platform 0.10 sec. after its release. if a further load of 400 kg is added to the platform, find, i) the frequency of damped vibrations, and i) the amplitude of vibration after 2 complete oscillations, given that the initial amplitude is 15 cm.
Answers: 1
Consider two possible schemes for measuring angular velocity with an encoder. In Scheme A, a timer i...
Biology, 22.06.2019 10:40
Computers and Technology, 22.06.2019 10:40
History, 22.06.2019 10:40
Mathematics, 22.06.2019 10:40