Engineering
Engineering, 08.03.2020 04:09, emmalie52

When using a spare tire, be sure to read and follow any indications for reduced speed. Where can you find this information?
A. the side of the spare tire
B. the side of the normal vehicle tire (the non-spare tire)
C. the inside of the fuel door
D. your vehicle's owner's manual

answer
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, heidiburgos1own6c0
Fluids at rest possess no flow energy. a)- true b)- false
Answers: 3
image
Engineering, 04.07.2019 19:10, batmanmarie2004
Afoot bridge is made as a simple deck, 4 m long, with a cross section 2 m (wide) and 20 cm thick, and made of wood. the deck is supported at the two ends. the maximum load allowable on the bridge is 10 tons, provided it is uniformly distributed on the deck. to sense this load, a strain gauge is placed at the center of the bridge and its resistance is monitored. if the sensor has a nominal resistance of 350 s2 and a gauge factor of 3.6, what is the reading of the strain gauge at maximum load? the modulus of elasticity for the wood used in the construction is 10 gpa.
Answers: 2
image
Engineering, 04.07.2019 19:10, Lexi5170
A)-explain briefly the importance of standards in engineering design. b)- what is patent? c)-explain the relationship between these standards: b. s. and b. s.en d)- in engineering design concepts, types of loads and how they act are important factors. explain.
Answers: 3
image
Engineering, 04.07.2019 19:20, kaitlyn114433
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
Do you know the correct answer?
When using a spare tire, be sure to read and follow any indications for reduced speed. Where can you...

Questions in other subjects:

Konu
Geography, 29.09.2019 13:50
Konu
Mathematics, 29.09.2019 13:50
Konu
Social Studies, 29.09.2019 13:50