Why might construction crews want to install pipes before the foundation is poured
A. Pipes form an important component of the structural integrity of a foundation.
B. All utilities, including electrical and HVAC, are installed before the foundation is laid.
C. Plumbing must feed into municipal water and sewer lines buried below the foundation.
D. Plumbing crews are more expensive than concrete masons; therefore it is cheaper if they do their work first.

answer
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, chadatkin
Which of the following ziegler nichols tuning methods the response of the controller to a step input should exhibit an s-shaped curve? a)-open loop mode b)-closed loop mode c)-both modes (open & closed) d)-none of the modes (open & closed)
Answers: 3
image
Engineering, 04.07.2019 18:10, 0436500
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
image
Engineering, 04.07.2019 19:10, lexie223
Acircular aluminum shaft mounted in a journal is shown. the symmetric clearance gap between the shaft and journal is filled with sae 10w-30 oil at t 30°c. the shaft is caused to turn by the attached mass and cord. develop and solve a differential equation for the angular speed of the shaft as a function of time.
Answers: 2
image
Engineering, 04.07.2019 19:20, littlepotato10
To save energy, the air supply to a 2000 ft office has been shut off overnight and the room temperature has dropped to 40°f. in the morning, the thermostat is reset to 70°f and warm air at 120 f begins to flov in at 200ft'/min. the air is well mixed within the room, and an equal mass flow of air at room temperature (changing with time) is withdrawn through a return duct. the air pressure is nearly 1 atm everywhere. ignoring heat transfer with the surroundings and kinetic and potential energy effects, estimate how long it takes for the room temperature to reach 70°f. plot the room temperature as a function of time.
Answers: 1
Do you know the correct answer?
Why might construction crews want to install pipes before the foundation is poured