Engineering
Engineering, 28.02.2020 22:49, avision42

OBJECTIVE This assignment will introduce you to core scheduling. 2. SPECIFICATIONS You are to simulate the execution of processes by a tablet with a large memory, one display, a multi-core processing unit, and one solid-state drive. Each process will be described by its start time and its process id followed by a sequence of resource requests. These resources requests will include core requests (CORE), SSD requests (SSD) and user interactions (TTY). Your input will be a sequence of pairs as in: NCORES 2 // number of cores START 12000 // new process PID 23 // process ID CORE 100 // request CORE for 100 ms TTY 5000 // 5000 ms user interaction CORE 80 // request CORE for 80 ms SSD 1 // request SSD for 1 ms CORE 30 // request CORE for 30 ms SSD 1 // request SSD for 1 ms CORE 20 // request CORE for 20 ms START 12040 // new process millisecond and read requests timing will be rounded down to zero. SSD scheduling will be strictly first come first-served. To simplify your life, we will also assume that: 1. There is no contention for main memory, 2. Context switch times can be neglected, and 3. User think times and other delays, like overlapping windows, are included in the TTY times. In addition, you can assume that all inputs will always be correct. Program organization: Your program should read its input file name though input redirection as in: ./a. out

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, sarahgrindstaff123
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
image
Engineering, 04.07.2019 18:10, selenamr
Ifa component is made of two or more materials with different modulus of elasticity (e), it is called a composite member and we calculate the factor·n". mention the formula for calculating n". also, ifn> 1, explain what will happen to the 1. transformed. gi) ifn 1, what will happen to the material when transformed material when
Answers: 1
image
Engineering, 04.07.2019 18:10, krystabrewer3
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
image
Engineering, 04.07.2019 19:20, ameliaxbowen7
List 3 options on how to reduce knocking problens during engine process,
Answers: 2
Do you know the correct answer?
OBJECTIVE This assignment will introduce you to core scheduling. 2. SPECIFICATIONS You are to simula...

Questions in other subjects:

Konu
Business, 06.07.2019 00:30