A heat pump cycle operating at steady state receives energy by heat transfer from well water at 10oC and discharges energy by heat transfer to a building at the rate of 1.4x105 kJ/h. Over a period of 14 days, an electric meter records that 1620 kW·h of electricity is provided to the heat pump. These are the only energy transfers involved. Determine the total amount of energy transfer by work into the heat pump over the 14-day period, in GJ. Determine the amount of energy that the heat pump receives by heat transfer from the well water over the 14-day period, in GJ. Determine the heat pump’s coefficient of performance.

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, krystabrewer3
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
image
Engineering, 04.07.2019 19:10, gabrielaperezcz
Air inially occupying a volume of 1 m2 at 100 kpa, 27 c undergoes three internally reversible processes in series. process 1-2 compression to 500 kpa during which pv constant process 2-3 adiabatic expanslon to 100 kpa process 3-1: constant-pressure expansion to 100 kpa (a) calculate the change of entropy for each of the three processes. (b) calculate the heat and work involved in each process. (c) is this cycle a power cycle or refrigeration cycle?
Answers: 3
image
Engineering, 04.07.2019 19:10, LadyHolmes67
Apressure vessel with an r/t 20 cannot be treated as thin walled vessel. a)-trune b)- false
Answers: 3
image
Engineering, 04.07.2019 19:10, ndaha
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
Do you know the correct answer?
A heat pump cycle operating at steady state receives energy by heat transfer from well water at 10oC...