Engineering, 26.02.2020 00:37, kaydeemyylady
A 500-ft-long equal-tangent crest vertical curve connects tangents that intersect at station 340 +00 and elevation 1322 ft. The initial grade is +4.0% and the final grade is -2.5%. Determine the elevation and stationing of the high point, PVC, and PVT. Solve this problem using parabolic equation and offset method.
Answers: 1
Engineering, 04.07.2019 18:10, ashleybaber4966
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
Engineering, 04.07.2019 18:10, johnthienann58
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
Engineering, 04.07.2019 18:10, nandalabella06
True or false (explain) (110)[111] is a slip system in bcc metals . the {111} family in fcc contains 8 planes. resolved shear stress (rss) in single crystals is just related to the applied stress. critical resolved shear stress (crss) in single crystal metals is direct proportional to the number of defects in the structure
Answers: 2
A 500-ft-long equal-tangent crest vertical curve connects tangents that intersect at station 340 +00...
Mathematics, 20.03.2020 10:03