Engineering
Engineering, 28.01.2020 03:31, strawberrymochi1078

Primary u. s. interstate highways are numbered 1-99. odd numbers (like the 5 or 95) go north/south, and evens (like the 10 or 90) go east/west. auxiliary highways are numbered 100-999, and service the primary highway indicated by the rightmost two digits. thus, the 405 services the 5, and the 290 services the 90 given a highway number, indicate whether it is a primary or auxiliary highway. if auxiliary, indicate what primary highway it serves. also indicate if the (primary) highway runs north/south or east/west. ex: if the input is: 90 the output is: the 90 is primary, going east/west. ex: if the input is: 290 the output is: the 290 is auxiliary, serving the 90, going east/west ex: if the input is g here to search the 290 is auxiliary, serving the 90, going eas ex: if the input is: 0 or any number not between 1 and 999, the output is: 0 is not a valid interstate highway number. see wikipedia for more info on highway numbering lab 4.16.1: lab: interstate highway numbers activity labprogr- 1 import java. util. scanner; 2 3 public class labprogram public static void main(stringl] args) t scanner scnr new scanner(system. in); int highwaynumber; int primarynumber; 4 5 6 7 highwaynumber scnr. nextint(); 1e type your code

answer
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, agpraga23ovv65c
Carbon dioxide gas expands isotherm a turbine from 1 mpa, 500 k at 200 kpa. assuming the ideal gas model and neglecting the kinetic and potential energies, determine the change in entropy, heat transfer and work for each kilogram of co2.
Answers: 2
image
Engineering, 04.07.2019 18:10, mirmir62
Machinery that is a key part of the process and without which the plant or process cannot function is classifed as: (clo4) a)-critical machinery b)-essential machinery c)-general purpose machinery d)-none of the specified options.
Answers: 1
image
Engineering, 04.07.2019 18:20, kodyclancy
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
image
Engineering, 04.07.2019 18:20, maciemarklin79981
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
Do you know the correct answer?
Primary u. s. interstate highways are numbered 1-99. odd numbers (like the 5 or 95) go north/south,...

Questions in other subjects:

Konu
Mathematics, 26.10.2021 20:30
Konu
Mathematics, 26.10.2021 20:30
Konu
Mathematics, 26.10.2021 20:30