Engineering
Engineering, 22.01.2020 23:31, Suttyyyyyybear9275

Question 14 a solution of methyl acetate c3h6o2 and water that is 25.% methyl acetate by mass is boiling at 94.7°c. the vapor is collected and cooled until it condenses to form a new solution. calculate the percent by mass of methyl acetate in the new solution. here's some data you may need: normal boiling point density vapor pressure at 94.7°c methyl acetate 57.°c 0.93gml 2360.torr water 100.°c 1.00gml 630.torr be sure your answer has 2 significant digits. note for advanced students: you may assume the solution and vapor above it are ideal.

answer
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, Tyrant4life
Draw the engineering stress-strain curve for (a) bcc; (b) fcc metals and mark important points.
Answers: 1
image
Engineering, 04.07.2019 18:20, ashleyjaslin
Derive the correction factor formula for conical nozzle i=-(1+ cosa) and calculate the nozzle angle correction factor for a nozzle whose divergence hal-fangle is 13 (hint: assume that all the mass flow originates at the apex of the cone.
Answers: 3
image
Engineering, 04.07.2019 18:20, karatsgrande3772
Determine the damped natural frequencies and the steady state response of a decoupled damped forced two degrees of freedom system. 10ä1 + 2q1 20q1 10 cos t; 10q2 +4q2 + 40q2 10 cos t
Answers: 3
image
Engineering, 04.07.2019 19:20, lordcaos066
Determine the time of the day and month of the year at which the peak sensible cooling load occurs for a top floor, north-eastern corner room of an office building in durban for the following conditions: floor area: 8 x 8 x 3 m east and north walls: 115 mm face brick (outside), 20 mm air space, 115 mm ordinary brick (inside) with 15 mm plaster roof construction: suspended plasterboard ceiling, 450 mm air space, 150 mm concrete, 75mm screed, waterproofing no heat transfer across other surfaces window area 3x 1,5 m high in north wall only. ordinary glass with venetian blinds. lights and occupants : from 07: 00 to 18: 00 average light density: 25 w/m2 number of occupants : 5 seated, light office work room temperature 24°c
Answers: 3
Do you know the correct answer?
Question 14 a solution of methyl acetate c3h6o2 and water that is 25.% methyl acetate by mass is boi...

Questions in other subjects:

Konu
History, 03.09.2020 19:01