Engineering, 20.01.2020 21:31, andydiaz1227
Asix-lane freeway (three lanes in each direction) with a 5.5% uphill grade 1.5 miles long has 10-ft lanes and obstructions 5 ft from the right edge. there are zero ramps within three miles upstream of the segment midpoint and one ramp within three miles downstream of the segment midpoint. the traffic stream has a peak hour factor of 0.84, peak-hour volume of 2500 vehicles with 3% rvs, 2% other single unit trucks, and 5% tractor trailer trucks. what is the level of service?
a. los a
b. los b
c. los c
d. los d
Answers: 1
Engineering, 03.07.2019 14:10, aliceohern
The y form of iron is known as: a) ferrite b) cementite c) perlite d) austenite
Answers: 3
Engineering, 04.07.2019 18:10, samanthabutryn
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
Engineering, 04.07.2019 18:10, 0436500
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
Engineering, 04.07.2019 19:10, Mimidj9279
The sum of the normal stresses does not change as the stress state rotates through an angle. a)-trune b)- false
Answers: 2
Asix-lane freeway (three lanes in each direction) with a 5.5% uphill grade 1.5 miles long has 10-ft...
Social Studies, 21.01.2021 20:00
Biology, 21.01.2021 20:00
Mathematics, 21.01.2021 20:00
Mathematics, 21.01.2021 20:00
English, 21.01.2021 20:00