Engineering, 25.12.2019 03:31, drcarver

find the solidification time of the two iron castings when both are poured
(with no superheats) into the sand molds at initial temperature 28°c.
(i) a slab shaped casting of 10 cm thickness, (ii) a sphere of 10 cm in dia. iron: freezing temp: 1540°c; l= 272 kj/kg; density = 7850 kg/m3 sand: c = 1.17 kj/kg-k; k = 0.865 w/mk; density = 1600 kg/m3

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, tobyhollingsworth178
Which from the following instrument is commonly used to detect the high pitch butzing sound in bearings? [clo4] a)-digital ultrasonic meter b)-infrared camera c)-spectroscopic d)-vibrometer
Answers: 2
image
Engineering, 04.07.2019 19:10, shunna33
Plan an experiment to measure the surface tension of a liquid similar to water. if necessary, review the ncfmf video surface tension for ideas. which method would be most suitable for use in an undergraduate laboratory? what experimental precision could be expected?
Answers: 2
image
Engineering, 04.07.2019 19:10, Lexi5170
A)-explain briefly the importance of standards in engineering design. b)- what is patent? c)-explain the relationship between these standards: b. s. and b. s.en d)- in engineering design concepts, types of loads and how they act are important factors. explain.
Answers: 3
image
Engineering, 06.07.2019 03:10, lwattsstudent
List and describe in sequence the operation process steps for boxf machine?
Answers: 1
Do you know the correct answer?
find the solidification time of the two iron castings when both are poured
(with no superheats...

Questions in other subjects:

Konu
Arts, 26.01.2021 23:10
Konu
Mathematics, 26.01.2021 23:10