The water of a 14โ€™ ร— 48โ€™ metal frame pool can drain from the pool through an opening at the side of the pool. the opening is about h = 1.03 m below the water level. the capacity of the pool is v = 3780 gallons, the pool can be drained in t = 13.5 mins. p0 is the pressure of the atmosphere. rho is the density of the water.

(a) write the bernoulli's equation of the water at the top of the pool in terms of p_0, rho, h. assuming the opening is the origin 0% deduction per feedback.
(b) write the bernoulli's equation of the water at the opening of the pool in terms of p_0, rho, h and v, where v is the speed at which the water leaves the opening. assuming the opening is the origin.
(c) express v^2 in terms of g and h.
(d) calculate the numerical value of v in meters per second.
(e) express the flow rate of the water in terms of v and t.
(f) express the cross-sectional area of the opening, a, in terms of v, v and t.
(g) calculate the numerical value of a in cm^2

answer
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 14:10, kayabwaller4589
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
image
Engineering, 04.07.2019 03:10, lauriepdx17
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
image
Engineering, 04.07.2019 18:10, ahmedeldyame
Aloaded platform of total mass 500 kg is supported by a dashpot and by a set of springs of effective stiffness 72 kn/m. it is observed that when the platform is depressed through a distance x = 12.5 cm below its equilibrium position and then released without any initial velocity; it reaches its equilibrium position in the shortest possible time without overshoot. find the position and velocity of the loaded platform 0.10 sec. after its release. if a further load of 400 kg is added to the platform, find, i) the frequency of damped vibrations, and i) the amplitude of vibration after 2 complete oscillations, given that the initial amplitude is 15 cm.
Answers: 1
image
Engineering, 04.07.2019 18:10, aliopqwas
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
Do you know the correct answer?
The water of a 14โ€™ ร— 48โ€™ metal frame pool can drain from the pool through an opening at the side of...

Questions in other subjects:

Konu
Mathematics, 21.01.2021 17:10
Konu
Mathematics, 21.01.2021 17:10
Konu
Geography, 21.01.2021 17:10