Engineering
Engineering, 07.12.2019 03:31, rky

Run the program and observe the output to be: 55 4 250 19. modify the numsinsert function to insert each item in sorted order. the new program should output: 4 19 55 250

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:20, samueltaye
Modern high speed trains do not have perpendicular expansion gaps where rails are joined end-to-end any more they are mostly welded together but what might happen if there was a spell of particularly hot weather that causes inspection of the tracks?
Answers: 1
image
Engineering, 06.07.2019 02:30, heavenwagner
A12 mm diameter shaft runs in a plain cylindrical bush 30 mm long that is located in an 18 mm diameter hole in a housing. the shaft-inner bush fit is h8 f and the outer bush-housing fit is h7-p6. make a fully cimensioned sketch of the bush with tolerances. find the maximum and minimum clearance or interference for both fits on the inner and outer diameters of the bush
Answers: 3
image
Engineering, 06.07.2019 05:10, squawk1738
The ivanpah solar thermal power plant cost $2.2 billion to build. the gross plant electric output is 392 mw, and the net output is 377 mw. the planned capacity factor was 27.4%, but the actual capacity factor in 2016 was 20.5%. at best the plant thermal efficiency appears to be 18%. in addition, for the daily startup process, the solar plant also burned 1.3x10^12 btu of natural gas in 2016. the cost of natural gas in 2016 was about $2.5 per million btu. assuming a levelized annual fixed charge rate of 7%, determine (a) the capital cost (c/kwh) and (b) the fuel cost (e/k wh) for the electricity in 2016.
Answers: 3
image
Engineering, 06.07.2019 05:30, beautifu3
Measuring the distance between two trees, you measure that there are 75.5 steps between the two trees. give an estimate of the unit of measurement of one step in meters and give an estimate of what you think its uncertainty is. give the distance that separates the trees in meters as well as feet/inches and round to the correct amount of significant digits. what would you say are the uncertainties for the these two distances
Answers: 3
Do you know the correct answer?
Run the program and observe the output to be: 55 4 250 19. modify the numsinsert function to insert...

Questions in other subjects: