Engineering
Engineering, 05.12.2019 21:31, barbie8775

An unfinished concrete semicircular channel with diameter of 3 ft is used to transport water over a distance of 1 mile. if flow is 90 ft3/s when the channel is full, calculate the minimum elevation difference in ft.

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, bunnles
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
image
Engineering, 04.07.2019 18:20, rhussein6452
Wiy doeres rere okhn a pump whon working betwon the same pressure range?
Answers: 2
image
Engineering, 04.07.2019 18:20, Doogsterr
For each of the following process: a) sketch the p-v diagram, b)sketch t-s diagram, c) sketch t-v diagram, d) sketch the boundary work on one of the diagrams (a, b or c) and e) sketch the reversible heat transfer on one of the diagrams (a, b or c): 1- isobaric process from compressed liquid to superheated vapor 2- isothermal process from compressed liquid to superheated vapor 3- isentropic process from compressed liquid to superheated vapor
Answers: 3
image
Engineering, 04.07.2019 19:10, gabrielaperezcz
Air inially occupying a volume of 1 m2 at 100 kpa, 27 c undergoes three internally reversible processes in series. process 1-2 compression to 500 kpa during which pv constant process 2-3 adiabatic expanslon to 100 kpa process 3-1: constant-pressure expansion to 100 kpa (a) calculate the change of entropy for each of the three processes. (b) calculate the heat and work involved in each process. (c) is this cycle a power cycle or refrigeration cycle?
Answers: 3
Do you know the correct answer?
An unfinished concrete semicircular channel with diameter of 3 ft is used to transport water over a...

Questions in other subjects:

Konu
Health, 16.02.2021 04:20
Konu
Mathematics, 16.02.2021 04:20