King khan corporation (kkc) manufactures kongs and kangs, the production of which requires considerable energy. power generation department costs amounted to $4 million this month, for a total of 50 million kilowatt hours (kwh) supplied to the plant. analysis shows that 40% of power generation costs are fixed. this month the kang dept. made 5 million kangs, each using 4 kwh, and the kang dept. made 4 million kangs, each using 6 kwh. if kkc uses the simplest algorithm to allocate power costs, which is not true?

a. kong will be charged $1.6 million

b. kang will be charged $2.18 million

c. kang’s charge will depend on kong’s usage

d. since the production departments consume the vast majority of the plant’s power costs, it is not cost-efficient to allocate power costs to the service departments

e. all are true

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 14:10, cowgyrlup124
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
image
Engineering, 04.07.2019 18:20, rjone8429
Asimple rankine cycle uses water as the working fluid. the water enters the turbine at 10 mpa and 480c while the condenser operates at 6 kpa. if the turbine has an isentropic efficiency of 80 percent while the pump has an isentropic efficiency of 70 percent determine the thermal efficiency
Answers: 1
image
Engineering, 04.07.2019 19:10, shayshay7874
An electric kettle is made out of stainless steel, weighs two pounds (when empty) and is equipped with a heating element that consumes 2 kw of electricity. assuming that the water and the kettle are at the same uniform temperature at any moment of time, calculate the shortest possible time to bring 2 quarts of water from room temperature to the onset of boiling
Answers: 2
image
Engineering, 04.07.2019 19:20, lordcaos066
Determine the time of the day and month of the year at which the peak sensible cooling load occurs for a top floor, north-eastern corner room of an office building in durban for the following conditions: floor area: 8 x 8 x 3 m east and north walls: 115 mm face brick (outside), 20 mm air space, 115 mm ordinary brick (inside) with 15 mm plaster roof construction: suspended plasterboard ceiling, 450 mm air space, 150 mm concrete, 75mm screed, waterproofing no heat transfer across other surfaces window area 3x 1,5 m high in north wall only. ordinary glass with venetian blinds. lights and occupants : from 07: 00 to 18: 00 average light density: 25 w/m2 number of occupants : 5 seated, light office work room temperature 24°c
Answers: 3
Do you know the correct answer?
King khan corporation (kkc) manufactures kongs and kangs, the production of which requires considera...

Questions in other subjects:

Konu
History, 24.07.2019 18:00
Konu
Mathematics, 24.07.2019 18:00
Konu
Mathematics, 24.07.2019 18:00