Engineering
Engineering, 26.11.2019 22:31, ayyyyy65

Apre-timed four-timing-stage signal has critical lane group flow rates for the first three timing stages of 200, 187, and 210 veh/h (saturation flow rates are 1800 veh/h/ln for all timing stages). the lost time is known to be 4 seconds for each timing stage. if the cycle length is 60 seconds, what is the estimated effective green time of the fourth timing stage?

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 19:30, 10040813
When using the ohmmeter function of a digital multimeter, the leads are placed in what position relative to the component being tested? a. parallel b. control c. series d. line
Answers: 3
image
Engineering, 04.07.2019 12:10, Ryantimes2
On a average work day more than work place firs are reorted
Answers: 1
image
Engineering, 04.07.2019 18:10, viicborella
Steel is coated with a thin layer of ceramic to protect against corrosion. what do you expect to happen to the coating when the temperature of the steel is increased significantly? explain.
Answers: 1
image
Engineering, 04.07.2019 18:10, siri5645
At 12 noon, the count in a bacteria culture was 400; at 4: 00 pm the count was 1200 let p(t) denote the bacteria cou population growth law. find: (a) an expression for the bacteria count at any time t (b) the bacteria count at 10 am. (c) the time required for the bacteria count to reach 1800.
Answers: 1
Do you know the correct answer?
Apre-timed four-timing-stage signal has critical lane group flow rates for the first three timing st...

Questions in other subjects:

Konu
Mathematics, 25.07.2021 04:20
Konu
Mathematics, 25.07.2021 04:20
Konu
Mathematics, 25.07.2021 04:20