Engineering
Engineering, 26.11.2019 21:31, Arealbot

Design a compensator to yield the following specifications: settling time 2: 86 seconds; percent overshoot 4: 32%; the steady-state error is to be improved by a factor of 2 over the uncompensated system. b. compare the transient and steady-state error specifications of the uncompensated and compensated systems. c. compare the gains of the uncompensated and compensated systems.

answer
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, Talos02
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
image
Engineering, 04.07.2019 18:10, aliopqwas
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
image
Engineering, 04.07.2019 18:10, wyattlb97
Water at the rate of 1 kg/s is forced through a tube with a 2.5 cm inner diameter. the inlet water temperature is 15°c, and the outlet water temperature is 50°c. the tube wall temperature is 14°c higher than the local water temperature all along the length of the tube. what is the length of the tube?
Answers: 3
image
Engineering, 04.07.2019 18:10, tobyhollingsworth178
Which from the following instrument is commonly used to detect the high pitch butzing sound in bearings? [clo4] a)-digital ultrasonic meter b)-infrared camera c)-spectroscopic d)-vibrometer
Answers: 2
Do you know the correct answer?
Design a compensator to yield the following specifications: settling time 2: 86 seconds; percent o...

Questions in other subjects:

Konu
Mathematics, 27.04.2021 19:10
Konu
Mathematics, 27.04.2021 19:10
Konu
Mathematics, 27.04.2021 19:10
Konu
Mathematics, 27.04.2021 19:10