Engineering
Engineering, 21.11.2019 02:31, isabellecannuli

Goal is to design a 4th - order iir butterworth bpf with center frequency 100 hz and bandwidth 40 hz. 1.choose an appropriate sampling rate (e. g., 300 hz) and determine the sample period.2.pre-warp the center, lower, and upper cutoff frequencies using, νœ”νœ”ν‘ν‘=2푇푇tan(푇푇2νœ”νœ”)3.create a normalized analog 4th-order butterworth lpf (normalized filter will have cutoff of 1 rad/sec), and apply lp to bp transform, using the prewrapped frequencies in step 3. 4.apply bilinear transform to create a digital filter, 퐻퐻(푧푧). 5.plot frequency response of both bpfs,퐻퐻(ν‘ ν‘ ) and 퐻퐻(푧푧).

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:20, maciemarklin79981
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150Β°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175Β°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25Β°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150Β°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25Β°c, respectively. if the panel is placed in the oven at an initial temperature of 25Β°c and removed from the chamber at a safe-to-touch tempera ture of 37Β°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
image
Engineering, 04.07.2019 19:10, LadyHolmes67
Apressure vessel with an r/t 20 cannot be treated as thin walled vessel. a)-trune b)- false
Answers: 3
image
Engineering, 04.07.2019 19:10, Calliedevore
The proportional limit is always greater than the yield strength for a material. a)-trune b)- false
Answers: 3
image
Engineering, 06.07.2019 04:10, ltorline123
Areheat rankine cycle operates with water as the working fluid. steam enters the first turbine at 8 mpa and 450Β°c and exits at 0.8 mpa. it is then reheated to 400Β°c before entering the second turbine, where it exits at 10 kpa. if the amount of work into the pump is 8.04 kj/kg and the net work per cycle produced is 1410.25 kj/kg, determine the thermal efficiency of the cycle.
Answers: 3
Do you know the correct answer?
Goal is to design a 4th - order iir butterworth bpf with center frequency 100 hz and bandwidth 40 hz...

Questions in other subjects: