Each of the following activities are commonly performed during the implementation of the database life cycle (dblc). fill in the blank, before each activity, with the phase number of the dbls that this activity would normally be performed.

dblc task numbers:

1. database initial study
2. database design
3. implementation and loading
4. testing and evaluation
5. operation
6. maintenance and evolution

the initial values into the tables
user documentation
tables, attributes, and indexes
to gain unauthorized access to the data
management
existing data
the competition's database
how to grant different levels of access to different user groups
the database
users
constraints to match changes in business rules
budget and scope
a dbms software solution
a logical erd
software patches to the dbms
the database
how this database will connect to other databases in the organization
a conceptual model
sure application software updates the database
security audits
objectives
a detailed model that can be physically implemented

answer
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:20, maciemarklin79981
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
image
Engineering, 04.07.2019 18:20, cxttiemsp021
Atank with constant volume contains 2.27 kg of a mixture of water phases (liquid-vapor). in the initial state the temperature and the quality are 127 °c and 0.6, respectively. the mixture is heated until the temperature of 160 oc is reached. illustrate the process in a t-v diagram. then, determine (1) the mass of the vapor in kg at the initial state, (2) the final pressure in kpa.
Answers: 3
image
Engineering, 04.07.2019 19:20, amcd2002
A21-tooth spur pinion mates with a 28-tooth gear. the diametral pitch is 3 teeth/in and the pressure angle is 20°, find the following values: the addendum, dedendum, circular pitch, tooth thickness, and base circle diameters.
Answers: 2
image
Engineering, 04.07.2019 19:20, brae72
Asimple speed reducer is composed of 2 spur gears. the pinion gear has a pitch diameter of 0.75" and 36 teeth while the driven gear has a pitch diameter of 4.0" and 192 teeth. a)-what is the diametral pitch of each gear? b)-if an electric motor rotating ccw at 3000 rpm is coupled to the pinion, what is the rotational speed of the driven gear? c)-if the torque delivered to the pinion is 1 n-m, what is the torque on the driven gear? d)-what is the power transmitted by the gear train?
Answers: 1
Do you know the correct answer?
Each of the following activities are commonly performed during the implementation of the database li...

Questions in other subjects:

Konu
English, 19.02.2021 18:40
Konu
Mathematics, 19.02.2021 18:40
Konu
Geography, 19.02.2021 18:40