Engineering, 09.11.2019 02:31, michael1498
2. (5 pts) a landscaper subcontractor signed a subcontract with a gc for a specific scope and price. the scope did not include watering the new grass seed to get it established, which involves temporary irrigation lines and sprinkler heads. the project was going well and towards the end the landscaper sent an email to the gc saying, "i’ve decided to water the grass for you." the sub later decided to buy his entire team 80’s retro ski jackets instead of watering the grass. was this a valid, legally enforceable contract to water the grass? why or why not?
Answers: 3
Engineering, 04.07.2019 18:10, danksans7011
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
Engineering, 04.07.2019 18:10, sarahgrindstaff123
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
Engineering, 04.07.2019 18:10, demarcuswiseman
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
2. (5 pts) a landscaper subcontractor signed a subcontract with a gc for a specific scope and price....
Mathematics, 31.01.2020 22:47
Computers and Technology, 31.01.2020 22:47
Computers and Technology, 31.01.2020 22:47
English, 31.01.2020 22:47