Engineering, 09.11.2019 02:31, michael1498

2. (5 pts) a landscaper subcontractor signed a subcontract with a gc for a specific scope and price. the scope did not include watering the new grass seed to get it established, which involves temporary irrigation lines and sprinkler heads. the project was going well and towards the end the landscaper sent an email to the gc saying, "i’ve decided to water the grass for you." the sub later decided to buy his entire team 80’s retro ski jackets instead of watering the grass. was this a valid, legally enforceable contract to water the grass? why or why not?

answer
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 16:10, Arealbot
The force on a cutting tool are 2600n vertically downward and 2100 horizontal. determine the resultant force acting on the tool and the angle at which it acts.
Answers: 1
image
Engineering, 04.07.2019 18:10, danksans7011
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
image
Engineering, 04.07.2019 18:10, sarahgrindstaff123
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
image
Engineering, 04.07.2019 18:10, demarcuswiseman
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
Do you know the correct answer?
2. (5 pts) a landscaper subcontractor signed a subcontract with a gc for a specific scope and price....