Consider a 100 mol mixture that is 80.0% methane (ch4) and 20.0% ethane (c2h6). to this mixture is added 22.0% excess air. of the methane present, 91.90% reacts, 90.90% of which forms carbon dioxide (co2), and the balance forms carbon monoxide (co). of the ethane present, 89.6% reacts, 90.90% of which forms carbon dioxide, and the balance forms carbon monoxide.

1)what is the theoretical amount of oxygen required for the fuel mixture?

2)what amount of air is added to the fuel mixture?

3)how many moles of methane is present in the product gas?

4)how many moles of ethane is present in the product gas?

5)how many moles of carbon dioxide is present in the product gas?

6)how many moles of carbon monoxide is present in the product gas?

7)how many moles of water vapor are present in the product gas?

8)how many moles of oxygen are present in the product gas?

9)how many moles of nitrogen are present in the product gas

answer
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, dval1146
You are making beer. the first step is filling the glass carboy with the liquid wort. the internal diameter of the carboy is 15 in., and you wish to fill it up to a depth of 2 ft. if your wort is drawn from the kettle using a siphon process that flows at 3 gpm, how long will it take to fill?
Answers: 1
image
Engineering, 04.07.2019 18:10, Strick1530
Which of the following components of a pid controlled accumulates the error over time and responds to system error after the error has been accumulated? a)- proportional b)- derivative c)- integral d)- on/off.
Answers: 2
image
Engineering, 04.07.2019 18:20, rocio5649
Amixture of slurry and mud is to be pumped through a horizontal pipe of diameter 500 mm. the fluid behaves as a bingham plastic with a yield stress of 30 pa and viscosity 0.04 pa. s. describe the effects of the shear stress through a transverse section of the pipe by plotting the variation in shear stress and velocity profile: (i) just before the slurry starts to move (ii) as the slurry flows when the pressure gradient is double that in part (i)
Answers: 3
image
Engineering, 04.07.2019 19:10, ndaha
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2