Engineering
Engineering, 30.10.2019 22:31, shy88

For this assignment, you will create a weighted scoring model to determine grades for a course based on the following information: final grades are based on - three exams worth 20%, 15%, and 25%, respectively homework is worth 15% a group project is worth 25% enter scores for three students - assume student 1 earns 100% (or 100) on every item. assume student 2 earns 70% on each of the exams, 80% on the homework, and 95% on the group project. assume student 3 earns 90% on exam 1, 80% on exam 2, 75% on exam 3, 80% on the homework, and 70% on the group project. you can use the weighted scoring model template wtd_decision_matrix. xlsx provided on the companion website for this text, create your own spreadsheet, or make the matrix by hand.

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, genyjoannerubiera
Assuming compressible flow of air and that the measurements are done at flagstaff a pitot static tube that gives the difference of total and static pressure measures 0.35 m of mercury. what is the velocity of air? assume the temperature to be 300k. (submit your excel or matlab calculation sheet)
Answers: 1
image
Engineering, 04.07.2019 19:10, kelseiroll9759
Ahelical coil spring has a mean diameter of 50 mm, a wire diameter of 5.5 mm and is wound with a pitch of 10 mm. the spring steel has an ultimate strength of 1250 mpa. find the force needed to compress the spring solid and the wire stress in this condition. state whether the spring will return to its initial length.
Answers: 1
image
Engineering, 04.07.2019 19:20, kaitlyn114433
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
image
Engineering, 04.07.2019 19:20, lovenahofer
Apreheater involves the use of condensing steam at 100°c on the inside of a bank of tubes to heat air that enters at 1 atm and 25°c. the air moves at 5 m/s in cross flow over the tubes. each tube is 1 m long and has an outside diameter of 10 mm. what is the minimum value of nl needed to achieve an outlet temperature of t 75 c? what is the corresponding pressure drop across the tube bank?
Answers: 3
Do you know the correct answer?
For this assignment, you will create a weighted scoring model to determine grades for a course based...

Questions in other subjects: