Engineering
Engineering, 22.10.2019 20:00, sebascarvallo2003

Six flags great america is constructing a new roller coaster. the project is scheduled to begin in the winter and they hope to have it ready for their busy summer season. the roller coaster planner has identified the following activities and their estimated times. immediate activity predecessor weeks a ā€” 3 b ā€” 1 c ā€” 2 d a, b, c 4 e d 5 f a 3 g d, f 6 h e 4 (a) draw the project network and compute the earliest start, latest start, earliest finish, and latest finish time for each activity. (b) how long will it take to complete the roller coaster? (c) what is the critical path? (d) compute the slack for each of the non-critical activities. (e) if the planner were to add extra resources to activity f so that it takes 2 weeks instead of 3 weeks, how long would it take to complete the roller coaster? homework 8 Ā©2015 david czerwinski 3 bus 190 (f) if the planner were to add extra resources to activity d so that it takes 3 weeks instead of 4 weeks, how long would it take to complete the roller coaster? (g) a component needed to complete activity g has been damaged and a replacement has been ordered. because of this, activity g will take four weeks longer than orig

answer
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 23:20, abbz13
Two technicians are discussing the intake air temperature (iat) sensor. technician a says that the computer uses the iat sensor as a backup to the engine coolant temperature (ect) sensor. technician b says that the powertrain control module (pcm) will subtract the calculated amount of fuel if the air measures hot. who is correct
Answers: 3
image
Engineering, 04.07.2019 18:10, abdirahmansoloman
Air is to be cooled in the evaporator section of a refrigerator by passing it over a bank of 0.8-cm-outer-diameter and 0.4-m-long tubes inside which the refrigerant is evaporating at -20Ā°c. air approaches the tube bank in the normal direction at 0Ā°c and 1 atm with a mean velocity of 4 m/s. the tubes are arranged in-line with longitudinal and transverse pitches of sl- st 1.5 cm. there are 30 rows in the flow direction with 15 tubes in each row. determine (a) the refrigeration capacity of this system and (b) pressure drop across the tube bank. evaluate the air properties at an assumed mean temperature of -5Ā°c and 1 atm. is this a good assumption?
Answers: 1
image
Engineering, 04.07.2019 18:10, keigleyhannah30
Aplate clutch has a single pair of mating friction surfaces 250-mm od by 175-mm id. the mean value of the coefficient of friction is 0.30, and the actuating force is 4 kn. a) find the maximum pressure and the torque capacity using the uniform-wear model. b) find the maximum pressure and the torque capacity using the uniform-pressure model.
Answers: 3
image
Engineering, 04.07.2019 18:10, caitlynnpatton1208
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
Do you know the correct answer?
Six flags great america is constructing a new roller coaster. the project is scheduled to begin in t...

Questions in other subjects:

Konu
Mathematics, 25.03.2021 08:50
Konu
Mathematics, 25.03.2021 08:50
Konu
Mathematics, 25.03.2021 08:50