Engineering, 19.10.2019 04:30, SkinnestXOXO
Production rate for an assembled product = 47.5 units per hour. total work content time = 32 minutes of direct manual labor. the line operates at 95% uptime. ten workstations have two workers on opposite sides of the line so that both sides of the product can be worked on simultaneously. the remaining stations have one worker. repositioning time lost by each worker is 0.2 min/cycle. it is known that the number of workers on the line is two more than the number required for perfect balance. determine (a) number of workers, (b) number of workstations, (c) balancing efficiency, and (d) average manning level.
Answers: 1
Engineering, 04.07.2019 18:10, sarahgrindstaff123
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
Engineering, 04.07.2019 18:10, nandalabella06
True or false (explain) (110)[111] is a slip system in bcc metals . the {111} family in fcc contains 8 planes. resolved shear stress (rss) in single crystals is just related to the applied stress. critical resolved shear stress (crss) in single crystal metals is direct proportional to the number of defects in the structure
Answers: 2
Engineering, 04.07.2019 18:10, juansoto227711
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
Production rate for an assembled product = 47.5 units per hour. total work content time = 32 minutes...
Mathematics, 18.07.2019 13:30
Biology, 18.07.2019 13:30
Biology, 18.07.2019 13:30