Engineering
Engineering, 04.10.2019 23:10, brittanyfox411

Use the output pin pb1 and an o-scope to create our own delay function. create a function void myharddelay(uint32 t delayinmsec), when called will delay an integer number of milliseconds before returning. inside the function create a delay by looping n * delayinmsec times. you will have to experiment to find a value n that provides an accurate delay function. this function should now be used in future projects, replacing the arduino wiring library function what is the value of n?

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, settasav9641
Abrake has a normal braking torque of 2.8 kip in and heat-dissipating cast-iron surfaces whose mass is 40 lbm. suppose a load is brought to rest in 8.0 s from an initial angular speed of 1600 rev/min using the normal braking torque; estimate the temperature rise of the heat dissipating surfaces.
Answers: 3
image
Engineering, 04.07.2019 18:10, siri5645
At 12 noon, the count in a bacteria culture was 400; at 4: 00 pm the count was 1200 let p(t) denote the bacteria cou population growth law. find: (a) an expression for the bacteria count at any time t (b) the bacteria count at 10 am. (c) the time required for the bacteria count to reach 1800.
Answers: 1
image
Engineering, 04.07.2019 18:10, soreese02
An ideal otto cycle with air as the working fluid has a compression ratio of 8. the minimum and maximum temperatures in the cycle are 300 k and 1340 k. use constant specific heats at room temperature to determine (a) the amount of heat transferred to the air during the heat- addition kj/kg, (b) the thermal efficiency, and (c) the thermal efficiency of a carnot cycle ope limits. process, in rating between the same temperature
Answers: 2
image
Engineering, 04.07.2019 18:10, samanthabutryn
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
Do you know the correct answer?
Use the output pin pb1 and an o-scope to create our own delay function. create a function void myhar...

Questions in other subjects:

Konu
Mathematics, 20.12.2020 15:10
Konu
Mathematics, 20.12.2020 15:10