Engineering
Engineering, 01.10.2019 19:30, mivantechenko9751

The mach number of an ideal ramjet is 2.88, and the external temperature is 400 ° r. the flow rate of air through the engine is 85 lbm/s. because of thermal limits of the materials, the burner exit total temperature is 3150 "r. the heating value of the fuel is 17,900 btu/ibm. what are the developed thrust, dimensionless thrust, fuel ratio, and tsfc for this engine?

answer
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, niyawilliams23
Asingle-geared blanking press has a stroke of 200 mm and a rated capacity of 320 kn. a cam driven ram is assumed to be capable of delivering the full press load at constant force during the last 15 percent of a constant-velocity stroke. the camshaft has an average speed of 90 rev/min and is geared to the flywheel shaft at a 6: 1 ratio. the total work done is to include an allowance of 16 percent for friction a) estimate the maximum energy fluctuation b) find the rim weight for an effective diameter of 1.2 m and a coefficient of speed fluctuation of 0.10
Answers: 1
image
Engineering, 04.07.2019 18:20, RiverH246
Air flows over a heated plate àt a velocity of 50m/s. the local skin factor coefficient at a point on a plate is 0.004. estimate the local heat transfer coefficient at this point. the following property data for air are given: density = 0.88kg/m3 , viscosity 2.286 x 10 ^-5 kgm/s , k = 0.035w/mk ,cp = 1.001kj/kgk. use colburn reynolds analogy.
Answers: 1
image
Engineering, 04.07.2019 18:20, cdyshaylia55
Water vapor initially at 10 bar and 400 °c is contained within a piston-cylinder assembly. the water lost heat to the surrounding according to isochoric (iso-volumetric) process until its temperature is 150 °c. the water is then condensed isothermally to saturated liquid. for the water as a system, calculate the work in kj/kg
Answers: 2
image
Engineering, 04.07.2019 19:10, ndaha
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
Do you know the correct answer?
The mach number of an ideal ramjet is 2.88, and the external temperature is 400 ° r. the flow rate o...

Questions in other subjects:

Konu
Mathematics, 29.01.2020 01:47
Konu
English, 29.01.2020 01:47
Konu
Mathematics, 29.01.2020 01:47