Engineering
Engineering, 20.09.2019 01:00, MalikaJones

Your engineering firm has been hired by the local electric company to construct them a wind farm on a square plot of 8567 hectares of land. the rotational diameter of the turbine blades is 50 meters. the distance between turbines from rotational diameter to rotational diameter in the same row must be 2500 feet and the distance between turbine rows must be 4000 feet in order for the turbines to operate at maximum efficiency. how many turbines will be in each row and how many rows of turbines will there be in total? remember, you can’t have a fraction of a turbine.

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, mm016281
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit. explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
image
Engineering, 04.07.2019 18:10, Talos02
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
image
Engineering, 04.07.2019 18:10, juansoto227711
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
image
Engineering, 04.07.2019 18:20, mjcbs21
What is the heat treatment of metals? what is the benefit of it? why and how it's useful? answer in details, do not write by hand.
Answers: 3
Do you know the correct answer?
Your engineering firm has been hired by the local electric company to construct them a wind farm on...

Questions in other subjects: