Engineering, 20.09.2019 01:00, MalikaJones
Your engineering firm has been hired by the local electric company to construct them a wind farm on a square plot of 8567 hectares of land. the rotational diameter of the turbine blades is 50 meters. the distance between turbines from rotational diameter to rotational diameter in the same row must be 2500 feet and the distance between turbine rows must be 4000 feet in order for the turbines to operate at maximum efficiency. how many turbines will be in each row and how many rows of turbines will there be in total? remember, you can’t have a fraction of a turbine.
Answers: 2
Engineering, 04.07.2019 18:10, juansoto227711
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
Your engineering firm has been hired by the local electric company to construct them a wind farm on...
Mathematics, 08.07.2019 00:30
Mathematics, 08.07.2019 00:30
Mathematics, 08.07.2019 00:30
English, 08.07.2019 00:30