Brian is responsible for ordering cement for a construction project. he had just determined that the construction crew would need 540 cubic yards of cement when the building owner decided to shorten the driveway, eliminating the need for 44 cubic yards of cement. how much cement will brian have to order now?

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, lerasteidl
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
image
Engineering, 04.07.2019 18:10, leomessifanboy678
The filament of an incandescent lamp has a temperature of 2000k. calculate the fraction of radiation emitted in the visible light band if the filament is approximated as blackbody
Answers: 2
image
Engineering, 04.07.2019 18:10, ayoismeisjjjjuan
Manometers are good examples of measuring instruments, nowadays they are not as common as before. a)-capacitive probe gauges b)-gravitational gauges deformation ) gauges d)-digital gauges
Answers: 1
image
Engineering, 04.07.2019 18:20, sarah7984
Vibration monitoring this technique uses the noise or vibration created by mechanical equipment and in seme cases by plant systems to detemine their actual condtion. a)- true b)- false
Answers: 2
Do you know the correct answer?
Brian is responsible for ordering cement for a construction project. he had just determined that the...

Questions in other subjects:

Konu
English, 06.12.2020 17:30
Konu
Mathematics, 06.12.2020 17:30