Engineering
Engineering, 14.09.2019 01:30, goargrant

A400 l closed rigid tank initially contains 2.06 kg of saturated liquid-vapor mixture of water at 50c (state 1). heat transfer occurs slowly to the tank until the final state is either saturated liquid or saturated vapor (state 2). (a) determine whether the final state is saturated liquid or saturated vapor. justify your answer with appropriate calculation. (b) calculate heat transfer (kj) during the process. (c) show the heating process on p-v diagram. label states, show property values, and indicate appropriate lines of constant temperature. (d) will the final state be saturated liquid or saturated vapor if the tank volume were to be 4 l? justify your answer with appropriate calculation.

answer
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, meganwintergirl
Afour cylinder four-stroke in-line engine has a stroke of 160mm, connecting rod length of 150mm, a reciprocating mass of 3kg and its firing order is 1-3-4-2. the spacing between cylinders is 100mm. i. show that the engine is in balance with regard to the primary inertia forces and primary 3. a and secondary inertia couples. li determine the out of balance secondary inertia force ii. propose ways of balancing this out of balance force and discuss the challenges that will arise
Answers: 3
image
Engineering, 04.07.2019 18:10, lerasteidl
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
image
Engineering, 04.07.2019 18:10, krystabrewer3
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
image
Engineering, 04.07.2019 18:10, 0436500
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
Do you know the correct answer?
A400 l closed rigid tank initially contains 2.06 kg of saturated liquid-vapor mixture of water at 50...

Questions in other subjects:

Konu
English, 26.01.2021 06:40
Konu
Mathematics, 26.01.2021 06:40
Konu
Mathematics, 26.01.2021 06:40
Konu
Computers and Technology, 26.01.2021 06:40