Aheat treating process (process 1) can be added to a processing line for $30,000. the annual operating costs are $12,000 and its life is expected to be 8 years with a $10,000 salvage value at that time. an alternative process (process 2) can be installed for $21,000. its annual operating costs are $15,000 and its life is also expected to be 8 years with a $7,000 salvage value. in both cases, the annual increase in revenue due to the addition of the heat treating process is $20,000. the company's tax rate is 52% and the method of depreciation is syd. compute the rate of return of each heat treating process after depreciation and taxes. on the basis of this rate of return analysis, which alternative should be selected?

answer
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, alyssabailey7545
Give heat transfer applications for the following, (i) gas turbines (propulsion) ) gas turbines (power generation). (iii) steam turbines. (iv) combined heat and power (chp). (v) automotive engines
Answers: 1
image
Engineering, 04.07.2019 18:10, johnthienann58
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
image
Engineering, 04.07.2019 18:10, Fahaddie
The thermal expansion or contraction of a given metal is a function of the f a)-density b)-initial temperature c)- temperature difference d)- linear coefficient of thermal expansion e)- final temperature f)- original length
Answers: 2
image
Engineering, 04.07.2019 18:10, mamasbug4285
An air compression refrigeration system is to have an air pressure of 100 psia in the brine tank and an allowable air temperature increase of 60°f for standard vapor compression cycle temperatures of 77 f entering the expansion cylinder and 14 f entering the compression cylinder, calculate the coefficient of performance a. 2.5 b 3.3 c. 4.0 d. 5.0
Answers: 3
Do you know the correct answer?
Aheat treating process (process 1) can be added to a processing line for $30,000. the annual operati...

Questions in other subjects:

Konu
English, 25.01.2022 04:00
Konu
Mathematics, 25.01.2022 04:00