Engineering
Engineering, 03.08.2019 05:10, jayjay2006

Two oil tanks are connected by two 9-m-long pipes, as in fig. p6.26. pipe 1 is 5 cm in diameter and is 6 m higher than pipe 2. it is found that the flow rate in pipe 2 is twice as large as the flow in pipe 1. (a) what is the diameter of pipe 2? (b) are both pipe flows laminar? (c) what is the flow rate in pipe 2 (m3/s)? neglect minor losses.

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, colin774
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
image
Engineering, 04.07.2019 19:10, nani3906
Starting wih an energy balance on a rectangular volume element, derive the one- dimensional transient heat conduction equation for a plane wall with constant thermal conductivity and no heat generation.
Answers: 1
image
Engineering, 04.07.2019 19:20, holaadios222lol
Apiping systems consists of 6 m of 6-std type k and 12 m of 4-std type k, both drawn copper tubing. the system conveys ethylene glycol at a rate of 0.013 m3/s. the pressure drop across the system is to be calculated. there are two 90° elbows in the 6-in pipe, a reduction from the 6-in pipe to the 4-in pipe and four 90° elbows in the 4-in pipe. all fittings are soldered (same as flanged) and regular. the inlet and outlet of the system are at the same height.
Answers: 1
image
Engineering, 04.07.2019 19:20, kaitlyn114433
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
Do you know the correct answer?
Two oil tanks are connected by two 9-m-long pipes, as in fig. p6.26. pipe 1 is 5 cm in diameter and...

Questions in other subjects:

Konu
Mathematics, 27.06.2019 05:00
Konu
History, 27.06.2019 05:00
Konu
Chemistry, 27.06.2019 05:00