Engineering
Engineering, 19.07.2019 06:20, jos1319

Your plant has a 400 kw and 520 kva demand and has a power contract which calls for a demand charge based on kva the demand charge is s3.00 per kva per month. a) what is the present power factor? b) what kvar size of capacitors is required to achieve a .95 desired power factor? c) how much will the monthly savings be?

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 14:10, bryneosburn
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
image
Engineering, 04.07.2019 18:10, 0436500
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
image
Engineering, 04.07.2019 19:20, justicehernandez
Acarnot refrigerator operates in a room in which the temperature is 21°c and of power when operating. if the food compartment of the refrigerator is consumes 3 kw to be maintained at 2°c, determine (a) the coefficient of performance of the cycle and (b) the rate of heat removal from the food compartment. refrigerator cycle that has a higher coefficient of performance than that of the discussed (e) is it possible to develop a carn ot refrigerator, operating between the same temperature limits? explain
Answers: 2
image
Engineering, 06.07.2019 02:30, heavenwagner
A12 mm diameter shaft runs in a plain cylindrical bush 30 mm long that is located in an 18 mm diameter hole in a housing. the shaft-inner bush fit is h8 f and the outer bush-housing fit is h7-p6. make a fully cimensioned sketch of the bush with tolerances. find the maximum and minimum clearance or interference for both fits on the inner and outer diameters of the bush
Answers: 3
Do you know the correct answer?
Your plant has a 400 kw and 520 kva demand and has a power contract which calls for a demand charge...

Questions in other subjects: