Computers and Technology

Building upon Problem 11.11, assume a 60 Hz nominal system frequency, that the bus fault actually occurs on the line between buses five and two but at the bus two end, and that the fault is cleared by opening breakers B21 and B52. Again, neglecting the loads, assume that the generator at bus three is modeled with the classical generator model having a per unit value (on its 800 MVA base) of X’d 0.24, and H = 3 p. u.-s. Before the fault occurs the generator is delivering 300 MW into the infinite bus at unity power factor (hence its terminal voltage is not 1.05 as was assumed in Example 6.9). Further, assume the fault is cleared after 3 cycles. Determine: (a) the initial generator one power angle, (b) the power angle when the fault is cleared, and (c) the maximum value of the power angle using the equal area criteria.

answer
Answers: 3

Other questions on the subject: Computers and Technology

image
Computers and Technology, 23.06.2019 04:00, china236
In a word processing program, such as microsoft word, which feature to you choose the desired picture enhancement?
Answers: 2
image
Computers and Technology, 24.06.2019 12:30, coursonianp8izbc
Do you think media is stereotype ? and why?
Answers: 1
image
Computers and Technology, 24.06.2019 14:00, ratpizza
Which describes careers that have similar education requirements but different qualifications? product safety engineers and materials engineers industrial safety engineers and industrial health engineers quality control systems managers and inspectors industrial safety and health engineers and hand packers
Answers: 3
image
Computers and Technology, 24.06.2019 18:50, LouieHBK
Which style did jack use on the vocabulary words in reports?
Answers: 2
Do you know the correct answer?
Building upon Problem 11.11, assume a 60 Hz nominal system frequency, that the bus fault actually oc...

Questions in other subjects:

Konu
Mathematics, 19.02.2021 05:00