Computers and Technology

Sequence S1: T1:R(X), T2:W(X), T2:W(Y), T3:W(Y), T1:W(Y), T1:Commit, T2:Commit, T3:CommitSequence S2: T1:R(X), T2:W(Y), T2:W(X), T3:W(Y), T1:W(Y), T1:Commit, T2:Commit, T3:CommitFor each sequence and for each of the following concurrency control mechanisms, describe how the concurrency control mechanism handles the sequence. Assume that the timestamp of transaction Ti is i. For lock-based concurrency control mechanisms, add lock and unlock requests to the previous sequence of actions as per the locking protocol. The DBMS processes actions in the order shown. If a transaction is blocked, assume that all its actions are queued until it is resumed; the DBMS continues with the next action (according to the listed sequence) of an unblocked transaction.1. Strict 2PL with timestamps used for deadlock prevention (using Wait-Die policy).2. Strict 2PL with deadlock detection. (Show the waits-for graph in case of deadlock.)3. Optimistic concurrency control.4. Timestamp concurrency control with buffering of reads and writes (to ensure recoverability) and the Thomas Write Rule.5. Multiversion timestamp concurrency control.

answer
Answers: 1

Other questions on the subject: Computers and Technology

image
Computers and Technology, 22.06.2019 19:30, ibrahimuskalel
Avariable definition defines the name of a variable that will be used in a program, as well as
Answers: 3
image
Computers and Technology, 23.06.2019 06:40, euniceyi56
How many nibbles can be stored in a 16-bit word?
Answers: 1
image
Computers and Technology, 23.06.2019 11:30, magicalpenguin48
In cell h5 enter a formula that will calculate the percentage of attendees that went to the altamonte springs job fair in 2018.
Answers: 1
image
Computers and Technology, 23.06.2019 12:00, xojade
Which of these is an example of an integrated presentation? a. a table created in powerpoint b. an image pasted into powerpoint c. a caption created in powerpoint d. an excel chart pasted into powerpoint
Answers: 1
Do you know the correct answer?
Sequence S1: T1:R(X), T2:W(X), T2:W(Y), T3:W(Y), T1:W(Y), T1:Commit, T2:Commit, T3:CommitSequence S2...

Questions in other subjects:

Konu
Mathematics, 23.02.2021 14:00
Konu
Social Studies, 23.02.2021 14:00