Computers and Technology
Computers and Technology, 19.06.2020 02:57, JeroMii

¿Qué es una fórmula de una hoja de calculo? ¿Cuáles son sus elementos?. Escribe al menos 5 ejemplos

answer
Answers: 1

Other questions on the subject: Computers and Technology

image
Computers and Technology, 22.06.2019 03:30, raytaylorh010801
Write a computer program to calculate the three-phase fault current for a fault at f in figure 1.16, with the network normal, and with one line at a time removedproblems 1.1 write a computer program to calculate the three-phase fault current for a fault at f in figure 1.16, with the network normal, and with one line at a time removed 20 power system relaying from service. the positive-sequence impedance data are given in the accompanying table. use the commonly made assumption that all prefault resistance values are (1.0+j0.0) pu, and neglect all resistance values. calculate the contribution to the fault flowing through the cb b and the voltage at that bus. for each calculated case, consider the two possibilities: cb b2 closed or open. the latter is known as the stub-end fault í• figure 1.16 problem 1.1 system data for figure 1.16 from to positive sequence 0.0+j0.1 0.05j0.15 0.04 j0.2 0.01 jo. i 0.015 + j0.15 0.01 j0.19 0.01 +j0.19 0.03+j0.1 0.0+j0.08 6 6 6 from service. the positive-sequence impedance data are given in the accompanying table. use the commonly made assumption that all prefault resistance values are (1.0 + j 0.0) pu, and neglect all resistance values. calculate the contribution to the fault flowing through the cb b1, and the voltage at that bus. for each calculated case, consider the two possibilities: cb b2 closed or open. the latter is known as the “stub-end” fault.
Answers: 2
image
Computers and Technology, 22.06.2019 13:30, baeethtsadia
Asoftware company hired ray, a college graduate to work in their development team. ray is assigned to work in the coding phase of a project. what happens during the coding phase of a software development project? a. the customer receives a working model of the software. b. developers convert the program design into code. c. developers gather requirements directly from the stakeholders. d. testing teams check the product for quality.
Answers: 1
image
Computers and Technology, 23.06.2019 05:00, sharkboy578
Acompany is inviting design for its new corporate logo from its users. this is an example of ? a. crowdfunding b. crowdvoting c. crowdsourced design d. crowdtracking
Answers: 3
image
Computers and Technology, 23.06.2019 18:30, DSUDLER5555
Write a program that prints the day number of the year, given the date in the form month-day-year. for example, if the input is 1-1-2006, the day number is 1; if the input is 12-25-2006, the day number is 359. the program should check for a leap year. a year is a leap year if it is divisible by 4, but not divisible by 100. for example, 1992 and 2008 are divisible by 4, but not by 100. a year that is divisible by 100 is a leap year if it is also divisible by 400. for example, 1600 and 2000 are divisible by 400. however, 1800 is not a leap year because 1800 is not divisible by 400.
Answers: 3
Do you know the correct answer?
¿Qué es una fórmula de una hoja de calculo? ¿Cuáles son sus elementos?. Escribe al menos 5 ejemplos...

Questions in other subjects:

Konu
Mathematics, 26.01.2020 00:31
Konu
Mathematics, 26.01.2020 00:31