Computers and Technology
Computers and Technology, 09.10.2019 01:30, zanaeb238

You are the scrum master. the sprint will complete in two days. each day of the sprint is equivalent to 8 hours. the team has just enough time to complete all tasks in the remaining 16 hours with the exception of three tasks. of these three tasks, two tasks (a total of 6 hours) are required to complete one product backlog item and one task (an estimate of 2 hours) is required to complete another product backlog item. how should the team handle the remaining three tasks?

answer
Answers: 3

Other questions on the subject: Computers and Technology

image
Computers and Technology, 22.06.2019 03:30, raytaylorh010801
Write a computer program to calculate the three-phase fault current for a fault at f in figure 1.16, with the network normal, and with one line at a time removedproblems 1.1 write a computer program to calculate the three-phase fault current for a fault at f in figure 1.16, with the network normal, and with one line at a time removed 20 power system relaying from service. the positive-sequence impedance data are given in the accompanying table. use the commonly made assumption that all prefault resistance values are (1.0+j0.0) pu, and neglect all resistance values. calculate the contribution to the fault flowing through the cb b and the voltage at that bus. for each calculated case, consider the two possibilities: cb b2 closed or open. the latter is known as the stub-end fault í• figure 1.16 problem 1.1 system data for figure 1.16 from to positive sequence 0.0+j0.1 0.05j0.15 0.04 j0.2 0.01 jo. i 0.015 + j0.15 0.01 j0.19 0.01 +j0.19 0.03+j0.1 0.0+j0.08 6 6 6 from service. the positive-sequence impedance data are given in the accompanying table. use the commonly made assumption that all prefault resistance values are (1.0 + j 0.0) pu, and neglect all resistance values. calculate the contribution to the fault flowing through the cb b1, and the voltage at that bus. for each calculated case, consider the two possibilities: cb b2 closed or open. the latter is known as the “stub-end” fault.
Answers: 2
image
Computers and Technology, 22.06.2019 10:00, banna01man
You need a reliable network for about twenty-five computers that will be distributed across a large building. it is important that the network be relatively cheap. which topology should you use?
Answers: 1
image
Computers and Technology, 22.06.2019 23:30, lexirandall19
Define a function printfeetinchshort, with int parameters numfeet and numinches, that prints using ' and " shorthand. ex: printfeetinchshort(5, 8) prints: 5' 8"
Answers: 1
image
Computers and Technology, 23.06.2019 06:00, 573589
What machine listens for http requests to come in to a website’s domain? a. a router b. a browser c. a server d. a uniform resource locator
Answers: 1
Do you know the correct answer?
You are the scrum master. the sprint will complete in two days. each day of the sprint is equivalent...

Questions in other subjects: