Chemistry
Chemistry, 14.12.2021 05:30, tammydbrooks43

It takes about 38 m3 of boards and plywood to build an average-size, single-family home. Can an average-size, single-family home be built with one day’s output from the saw mill? About how many days will it take for the saw mill to produce enough lumber to build a neighborhood of 100 average-size homes?

answer
Answers: 2

Other questions on the subject: Chemistry

image
Chemistry, 21.06.2019 22:30, kiki197701
Agas at 155 kpa and standard temperature has an initial volume of 1.00 l. the pressure of the gas rises to 500 kpa as the temperature also rises to 135°c. what is the new volume? 2.16 l 0.463 l 0.207 l 4.82 l
Answers: 3
image
Chemistry, 22.06.2019 05:20, jtingley0502
Temperature is _related to the average kinetic energy of a gas. inversely directly not disproportionally
Answers: 1
image
Chemistry, 22.06.2019 08:30, audrey1256
Which change in temperature is the smallest? a change of 1 thomson degree a change of 1 kelvin degree a change of 1 fahrenheit degree a change of 1 celsius degree
Answers: 1
image
Chemistry, 22.06.2019 12:30, nekathadon
The bond energy for the van der waals bond between two helium atoms is 7.9×10−4ev. assuming that the average kinetic energy of a helium atom is (3/2)kbt, at what temperature is the average kinetic energy equal to the bond energy between two helium atoms
Answers: 1
Do you know the correct answer?
It takes about 38 m3 of boards and plywood to build an average-size, single-family home. Can an aver...

Questions in other subjects:

Konu
Mathematics, 04.02.2020 02:45