Business
Business, 30.07.2019 10:00, dondre54

Deviating significantly from the standard business plan format is a mistake because:

answer
Answers: 1

Other questions on the subject: Business

image
Business, 22.06.2019 11:30, khynia11
Given the following information about the closed economy of brittania, what is the level of investment spending and private savings, and what is the budget balance? assume there are no government transfers. gdp=$1180.00 million =$510.00 million =$380.00 million =$280.00 million
Answers: 3
image
Business, 22.06.2019 17:00, PlzNoToxicBan
Cadbury has a chocolate factory in dunedin, new zealand. for easter, it makes two kinds of “easter eggs”: milk chocolate and dark chocolate. it cycles between producing milk and dark chocolate eggs. the table below provides data on these two products. demand (lbs per hour) milk: 500 dark: 200 switchover time (minutes) milk: 60 dark: 30 production rate per hour milk: 800 dark: 800 for example, it takes 30 minutes to switch production from milk to dark chocolate. demand for milk chocolate is higher (500lbs per hour versus 200 lbs per hour), but the line produces them at the same rate (when operating): 800 lbs per hour. a : suppose cadbury produces 2,334lbs milk chocolate and 1,652 lbs of dark chocolate in each cycle. what would be the maximum inventory (lbs) of milk chocolate? b : how many lbs of milk and dark chocolate should be produced with each cycle so as to satisfy demand while minimizing inventory?
Answers: 2
image
Business, 22.06.2019 19:50, crzyemo865
Aproduction line has three machines a, b, and c, with reliabilities of .96, .86, and .85, respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. in either case, three machines (a, b, and c) would be used with reliabilities equal to the original three. a. compute overall system reliability under plan 1. (round your intermediate calculations and final answer to 4 decimal places.) reliability b. compute overall system reliability under plan 2. (round your intermediate calculations and final answer to 4 decimal places.) reliability c. which plan will provide the higher reliability? plan2plan1
Answers: 3
image
Business, 23.06.2019 10:00, crystalxolotp4q3la
The american dream includes home ownership. but in the last few years, it's gotten harder and harder to own a home. do you think home ownership is important to most americans today? why or why not?
Answers: 1
Do you know the correct answer?
Deviating significantly from the standard business plan format is a mistake because:...

Questions in other subjects:

Konu
Mathematics, 16.01.2021 01:20
Konu
Social Studies, 16.01.2021 01:20
Konu
Mathematics, 16.01.2021 01:20