The Sharon Construction Corporation has been awarded a contract for the construction of a 20,000-seat stadium. The construction starts on Monday, February 15, 2016andmustbe completed within 52 weeks. A penalty clause of $15,000 per week for each full or partial of delay beyond this date was written into the contract. Jim Brown, the president of the company, called a planning meeting. In the meeting he expressed great satisfaction at obtaining the contract and revealed that the company could net as much as $300,000on the project. He was confident that the project could be completed on time with an allowance made for the usual delays anticipated in such a large project. Bonnie Green, the director of personnel, agreed that in a normal year only slight delays might develop due to a shortage of labor. However, she reminded the president that for such a large project, the company would have to use unionized employees and that the construction industry labor agreements were to expire on November 27. Past experience indicated a fifty–fifty chance of a strike. Jim Brown agreed that a strike might cause a problem. Unfortunately, there was no way to change the contract. He inquired about the prospective length of a strike. Bonnie figured that such a strike would last either eight weeks (70 percent chance) or possibly 12 weeks (30 percent chance). Jim was not pleased with these prospects. However, before he had a chance to discuss contingency plans he was interrupted by Jack White, the vice-president for engineering. Jack commented that a colder December than had been assumed was now being predicted. This factor had not been taken into consideration during earlier estimates since previous forecasts called for milder weather. Concrete pouring in December might thus require in one out of every three cases (depending on the temperature) special heating that costs $500 per week. This additional information did not please Jim at all. The chances for delay were mounting. And an overhead expense of $500 per week would be incurred in case of any delay that exceeds the baseline schedule as defined in Appendix. The technical details of the project are given in the appendix to this case. The management team was asked to consider alternatives for coping with the situation. At the end of the week, four proposals were submitted:

Required:
a. Expedite the pouring of seat gallery supports. This would cost $20,000 and cut the duration of the activity to six weeks.
b. Put a double shift on the filling of the field. A cost of $10,000 would result in a five-week time reduction.
c. The roof is very important since it precedes several activities. The use of three shifts and some overtime could cut six weeks off the roofing at an additional cost of only $9,000.
d. Do nothingAppendix: Technical Details of the StadiumThe stadium is an indoor structure with a seating capacity of 20,000.

answer
Answers: 3

Other questions on the subject: Business

image
Business, 22.06.2019 06:00, bobbyxii6033
Suppose that a monopolistically competitive restaurant is currently serving 260 meals per day (the output where mr
Answers: 2
image
Business, 22.06.2019 13:50, tinasidell1972
The retained earnings account has a credit balance of $24,650 before closing entries are made. if total revenues for the period are $77,700, total expenses are $56,900, and dividends are $13,050, what is the ending balance in the retained earnings account after all closing entries are made?
Answers: 2
image
Business, 22.06.2019 19:50, sp00ns
What is the present value of the following cash flow stream at a rate of 12.0%? years: 0 1 2 3 4| | | | |cfs: $0 $1,500 $3,000 $4,500 $6,000a. $9,699b. $10,210c. $10,747d. $11,284e. $11,849
Answers: 3
image
Business, 22.06.2019 20:40, mom1645
Which of the following is true concerning the 5/5 lapse rule? a) the 5/5 lapse rule deems that a taxable gift has been made where a power to withdraw in excess of $5,000 or five percent of the trust assets is lapsed by the powerholder. b) the 5/5 lapse rule only comes into play with a single beneficiary trust. c) amounts that lapse under the 5/5 lapse rule qualify for the annual exclusion. d) gifts over the 5/5 lapse rule do not have to be disclosed on a gift tax return.
Answers: 1
Do you know the correct answer?
The Sharon Construction Corporation has been awarded a contract for the construction of a 20,000-sea...

Questions in other subjects:

Konu
Mathematics, 08.01.2021 02:00
Konu
Spanish, 08.01.2021 02:00
Konu
Mathematics, 08.01.2021 02:00
Konu
Mathematics, 08.01.2021 02:00