In a system with four distinct production steps, the manager decided to double the capacity of the system by adding another machine to the bottleneck step. However the capacity of the system did not double. Which of the following is a possible explanation? Group of answer choices This would not be a problem if arrival rates were variable. There were multiple bottlenecks to begin with. Another step became the bottleneck after the second bottleneck machine was added. Service times are highly variable. Both B and C are possible explanations.

answer
Answers: 3

Other questions on the subject: Business

image
Business, 21.06.2019 22:50, nayelimoormann
The following data pertains to activity and costs for two months: june july activity level in 10,000 12,000 direct materials $16,000 $ ? fixed factory rent 12,000 ? manufacturing overhead 10,000 ? total cost $38,000 $42,900 assuming that these activity levels are within the relevant range, the manufacturing overhead for july was: a) $10,000 b) $11,700 c) $19,000 d) $9,300
Answers: 2
image
Business, 22.06.2019 01:30, BaileyRyan8320
In the fall, jay thompson decided to live in a university dormitory. he signed a dorm contract under which he was obligated to pay the room rent for the full college year. one clause stated that if he moved out during the year, he could sell his dorm contract to another student who would move into the dormitory as his replacement. the dorm cost was $5000 for the two semesters, which jay had already paid a month after he moved into the dorm, he decided he would prefer to live in an apartment. that week, after some searching for a replacement to fulfill his dorm contract, jay had two offers. one student offered to move in immediately and to pay jay $300 per month for the eight remaining months of the school year. a second student offered to move in the second semester and pay $2500 to jay. jay estimates his food cost per month is $500 if he lives in the dorm and $450 if he lives in an apartment with three other students. his share of the apartment rent and utilities will be $404 per month. assume each semester is 4.5 months long. disregard the small differences in the timing of the disbursements or receipts. what is the cost of the cheapest alternative?
Answers: 1
image
Business, 22.06.2019 03:00, brarob340
Tina is applying for the position of a daycare assistant at a local childcare center. which document should tina send with a résumé to her potential employer? a. educational certificate b. work experience certificate c. cover letter d. follow-up letter
Answers: 1
image
Business, 22.06.2019 15:40, Zachary429
Brandt enterprises is considering a new project that has a cost of $1,000,000, and the cfo set up the following simple decision tree to show its three most likely scenarios. the firm could arrange with its work force and suppliers to cease operations at the end of year 1 should it choose to do so, but to obtain this abandonment option, it would have to make a payment to those parties. how much is the option to abandon worth to the firm?
Answers: 1
Do you know the correct answer?
In a system with four distinct production steps, the manager decided to double the capacity of the s...

Questions in other subjects:

Konu
Biology, 17.12.2020 22:30
Konu
Mathematics, 17.12.2020 22:30
Konu
Chemistry, 17.12.2020 22:30
Konu
Mathematics, 17.12.2020 22:30