Business
Business, 22.07.2021 18:50, lilinicholeb

ated total manufacturing overhead $2,814,000 Estimated total direct labor-hours 134,000 DLHs Required: 1-a. Compute the predetermined overhead rate based on direct labor-hours. 1-b. Using the predetermined overhead rate and other data from the problem, determine the unit product cost of each product. 2. The company is considering replacing its conventional costing system with an activity-based costing system that would assign its manufacturing overhead to the following four activity cost pools: Estimated Overhead Cost Expected Activity Activity Cost Pools and Activity Measures Challenger Vapor Total Supporting direct labor (direct labor-hours) $ 1,038,500 49,000 85,000 134,000 Batch setups (setups) 1,100,000 300 200 500 Product sustaining (number of products) 582,500 1 1 2 General factory (machine-hours) 93,000 3,500 8,500 12,000 Total manufacturing overhead cost $ 2,814,000 Determine the activity rate for each of the four activity cost pools. 3. Using the activity rates and other data from the problem, determine the unit product cost of each product.

answer
Answers: 3

Other questions on the subject: Business

image
Business, 22.06.2019 00:40, mmsomefood85
Gdonald was unhappy that his company did not provide good transport facilities. he found it very strenuous to drive to work on his own, and this eventually led to job dissatisfaction. hence, he recommended ways to solve this problem. according to the evln model, this information suggests that donald's main reaction to job dissatisfaction was:
Answers: 3
image
Business, 22.06.2019 05:00, and7393
Xie company identified the following activities, costs, and activity drivers for 2017. the company manufactures two types of go-karts: deluxe and basic. activity expected costs expected activity handling materials $ 625,000 100,000 parts inspecting product 900,000 1,500 batches processing purchase orders 105,000 700 orders paying suppliers 175,000 500 invoices insuring the factory 300,000 40,000 square feet designing packaging 75,000 2 models required: 1. compute a single plantwide overhead rate, assuming that the company assigns overhead based on 125,000 budgeted direct labor hours. 2. in january 2017, the deluxe model required 2,500 direct labor hours and the basic model required 6,000 direct labor hours. assign overhead costs to each model using the single plantwide overhead rate.
Answers: 3
image
Business, 22.06.2019 08:00, connermichaela
Who is not spending wisely? erika goes shopping and saves her receipts. she totals how much she spent and writes it down. mia needs to buy a new pair of shoes because she joined the soccer team. she looks at newspaper ads to find the best price. lauren has been thinking about getting a puppy for a long time. she walks by the pet store at the mall and decides to get a puppy. erin makes a purchase online using a credit card. she knows that she can pay the entire bill when it arrives.
Answers: 2
image
Business, 22.06.2019 22:00, Kira4585
Retail industry fundamentals credential exam, part 1 all answers
Answers: 3
Do you know the correct answer?
ated total manufacturing overhead $2,814,000 Estimated total direct labor-hours 134,000 DLHs Require...

Questions in other subjects: